Gullfaks B contract to MSS

Gullfaks B - Statoil - Module Solutions & Systems

05. Jan Gullfaks B contract to MSS

MSS to provide a complete freezer room including cooling system to Gullfaks B.

MSS has been awarded a contract by Aker Offshore Partner for delivery and installation of freezer room on the Gullfaks B platform. The contract includes engineering, design, fabrication and installation and will be completed by February this year. The freezer room is an extension of the existing cold storage facilities on the platform and will be built at site using ProTek™ fire and blast protection panels.

The ProTek™ panels meet the requirements of A60 fire protection and blast overpressure of 0.15 barg. The panels are developed and manufactured by MSS alliance partner Solent Composite Systems Ltd. (SCS) on the Isle of Wight (UK). The DNV-certified panels are made of advanced composites, with low weight, are easy to install, and require no maintenance, states Sales and Marketing Manager Kjetil Jacobsen of MSS.


 

Source: Digital
Credit: Ole Jørgen Bratland Statoil ASA