East Anglia THREE – HVDC Platform

Problem: Aker Solutions needed a long-lasting, low-maintenance access solution for the East Anglia THREE HVDC platform—part of a major offshore wind project in the UK sector. The platform required safe and corrosion-resistant materials for walkways and vertical access points. Traditional steel posed challenges related to weight, corrosion, and safety in wet and marine environments. […]
DURAGRID® Phenolic Pultruded Grating

DURAGRID® Phenolic @ Snorre A MSS has delivered FRP products to Snorre A.
DURAGRID® Phenolic Pultruded Grating

DURAGRID® Phenolic @ Johan Sverdrup MSS has delivered more then 6 000 m2 to Johan Sverdrup.
MARRS® Offshore Handrailing

MARRS® @ Valhall MSS facilitated for the installation of 100 m of NORSOK compliant MARRS® OFFSHORE handrails to replace corroded aluminium handrails situated along a 50 m walkway. The phenolic handrails varied from 2.5 m to 4.5 m in size and were manufactured from structural FRP profiles to BS EN 10204:2004 Cert 3.1 Quality Assurance. […]
MARRS® Offshore Handrailing

MARRS® @ Mariner A MSS qualified antenna brackets and luminaire fixtures to be attached to MARRS® offshore handrails. The MARRS® Offshore Handrail was installed to replace aluminium handrailing that interfered with the antennas signaling. The MARRS® handrailing made a smooth interface toward the existing aluminium handrailing. MSS arrange for offshore installation.
MARRS® Offshore Handrailing

MARRS® @ Troll B ZMP Prefabricated handrails components that were installed at Aker Solutions’ yard in Egersund, Norway. Beside delivery of prefabricated handrail panels MSS also arranged for onsite training of Aker Solution personnel and guided in them in self-fabrication. This allowed for customization of panels by the yard itself and provided flexibility in the […]